Difference between revisions of "Staging Crew Member"
(This edit applies specifically to Winter Retreat) |
(This edit applies specifically to Winter Retreat) |
||
Line 2: | Line 2: | ||
[[Category:Activities Staff]] | [[Category:Activities Staff]] | ||
− | Needed: 3 people | + | Needed (Specific to Winter Retreat): 2 or 3 people- will work together with sound tech person |
{| class="wikitable" | {| class="wikitable" | ||
Line 23: | Line 23: | ||
* Take the songbooks indoors after an outdoor activity - even the singing before the meals - to prevent them from getting wet in any rain. | * Take the songbooks indoors after an outdoor activity - even the singing before the meals - to prevent them from getting wet in any rain. | ||
* Gather wood for fire(logs already cut, but kindling needed) | * Gather wood for fire(logs already cut, but kindling needed) | ||
− | + | * Build a camp fire for midnight prayer. If it is raining really hard, build it in the dining hall. | |
− | * Build a camp fire for | ||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 16:28, 1 November 2014
Needed (Specific to Winter Retreat): 2 or 3 people- will work together with sound tech person
Physical Capability | Required |
---|---|
Long periods of standing | no |
Walking long distances | no |
Heavy lifting | yes |
Helps to set up for activities and presentations. The staging crew's assignments include:
Set up for activities ahead of time. Specifically:
- Move the Sound Equipment.
- Bring the songbook to the next location of people singing.
- Take the songbooks indoors after an outdoor activity - even the singing before the meals - to prevent them from getting wet in any rain.
- Gather wood for fire(logs already cut, but kindling needed)
- Build a camp fire for midnight prayer. If it is raining really hard, build it in the dining hall.