Difference between revisions of "Staging Crew Member - Winter Retreat"
(Created page with "Category:Staff Descriptions Category:Activities Staff Category:Camp Innabah Staff Descriptions Needed: 2 or 3 people {| class="wikitable" |- ! Physical Capabilit...") |
m (Removed extra line break at top of page) |
||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
Needed: 2 or 3 people | Needed: 2 or 3 people | ||
Line 23: | Line 19: | ||
* Gather wood for fire(logs already cut, but kindling needed) | * Gather wood for fire(logs already cut, but kindling needed) | ||
* Build a camp fire for midnight prayer. If it is raining really hard, build it in the dining hall. | * Build a camp fire for midnight prayer. If it is raining really hard, build it in the dining hall. | ||
+ | |||
+ | [[Category:Staff Descriptions]] | ||
+ | [[Category:Activities Staff]] | ||
+ | [[Category:Camp Innabah Staff Descriptions]] |
Revision as of 10:44, 30 November 2014
Needed: 2 or 3 people
Physical Capability | Required |
---|---|
Long periods of standing | no |
Walking long distances | no |
Heavy lifting | yes |
Helps to set up for activities and presentations. The staging crew's assignments is to set up for activities ahead of time. Specifically:
- Move the Sound Equipment. Only one person on the staging team needs to know how to set up the sound equipment.
- Bring the songbook to the next location of people singing.
- Take the songbooks indoors after an outdoor activity—even the singing before the meals—to prevent them from getting wet in any rain.
- Gather wood for fire(logs already cut, but kindling needed)
- Build a camp fire for midnight prayer. If it is raining really hard, build it in the dining hall.